Project and subcontractor intake
Capture the site, package, requested action and due date in a consistent format.
Organize project intake, subcontractor requests and document review handoffs with clear responsibility and approval boundaries.
✳ Workflow scope, systems, permissions and human decision points are confirmed before rollout.
PROJECT COORDINATION
Keep every request attached to the correct project, document version, responsible discipline and approval boundary—from intake through recorded resolution.
Site safety, engineering approval, contract changes and commercial commitments remain with authorized professionals. An automated summary is not an approved instruction or signed variation.
See the related workflow use case →Linked to drawing A-204
Capture the site, package, requested action and due date in a consistent format.
Link the question to the relevant drawing or document version and responsible reviewer.
Track who reviewed the item, the recorded decision and outstanding exceptions.
CONNECTED PROCESS
Begin with one bounded process, clear data sources and a named owner for every exception. Expand only after the result is visible and repeatable.
Capture the project, package and requested action.
Attach the current approved document or drawing reference.
Assign the responsible project, design or commercial owner.
Record the formal decision and keep unresolved exceptions visible.
RESPONSIBLE AUTOMATION
Useful automation depends on current information, appropriate access and an explicit route back to people.
Tie each request and response to the relevant document revision.
Engineering, safety and site instructions remain with authorized professionals.
Variations, costs and contractual commitments require documented authority.
BUYER QUESTIONS
Use these answers to prepare your discovery call and identify the systems, permissions and owners needed for a pilot.
It can structure intake, find approved references and route an RFI, while the formal technical response remains with an authorized reviewer.
No. Engineering approvals, contract variations and commercial commitments require authorized professional sign-off.
The workflow must reference an agreed document-control source and preserve the exact revision used for each action.
Share the current tools, handoffs and exceptions. We will identify a bounded starting point and the controls it needs.